We finished the laundry room probably two months ago now, but only recently got around to the door project we were going back and forth on. We decided to go ahead with it, and I am so glad we did. I am loving the new look. It's actually hard to believe this is the same room since we changed so much! Here are some before and after shots:
 |
| before |
 |
| after |
panoramic pics from my cell phone, a bit distorted but the only way to show the whole width of the room:
 |
| before |
 |
| after |
In case you are wondering - yes that is a tension shower rod stretched sideways across the room in the "before" photos. My solution to a temporary hanging space. And yes it did fall down at least once a week because we were constantly hanging too much on it...
This started as a simpler house project than it ended up (
doesn't it always?!) Originally, we were just going to add in a counter top, base cabinet, sink, upper cabinets with hanging bar, and tile backsplash. We were also planning to paint - gold walls just ain't my bag, baby. We never intended to move plumbing and replace the tile floor, but you know - snowball effect... So basically we gutted the entire room and started fresh. We had replaced the washer and dryer when we moved in last year, so that was the only thing we didn't need to change out.
Remember all those kitchen cabinets we took down when we added in open kitchen shelving a few months back? Well, we were able to re-purpose all of them - two here in the laundry room and the rest are now extra storage space in the garage. The base cabinet was one we bought as a clearanced floor model at Lowe's. It was a lovely rustic brown color before, but I wanted it to match the upper cabinets so we decided to paint it. We also added extra wood to the top to make it the right height to support the sink and counter top. Here is a picture of it mid-project:
And completed:
We sanded, primed, and painted it to match the upper cabinets. We also removed the thermafoil covering from the upper cabinet doors, and gave them a fresh coat of paint so everything was the same color white. Added on some new hardware and that part was done! The counter top was built by Erik out of wooden planks. I think they were 1x6 boards. He used a jig to drill the holes (I have always wanted a jig so I was super excited about that purchase - yes, I realize my dork-factor here) and then glued and clamped the boards for extra strength. He then sanded, stained, and sealed (like eight times!) the top for durability. Once we decided on a sink, he cut a hole to drop it in. Here he is working on the counter top:

Like I mentioned, we had no intention on ever having to move any plumbing for this project. However, once we took out the washer, dryer, and sink, I was standing outside the door eyeing the project (dangerous territory - this is how it always starts) and I said "wouldn't it be nice if the washer and dryer were next to each other for laundry purpouses but also to give us a bigger folding area?" And Erik, after thinking about it for a day, decided he thought it was possible. "Just let me cut a little hole in the wall to look at the plumbing..." and the next thing I knew the room looked like this:

Ha! Erik worked quickly to put it back together and moving the plumbing ended up not being as big of an deal as we thought it might. Once everything was plumbed and patched up he moved onto flooring. We had also initially not intended on replacing the tile as the room already had tile and it was "okay" looking. But on one of our Lowe's runs while shopping for wall tile we came across the same wood plank looking tile we had used at our old house and we both stood there lovingly petting it (yea, that's what we do in home improvement stores.) We literally looked at each other and Erik, with a big sigh said "okay, just put it in the cart." So, that began this part of the project:
 |
| finished tile floor ( insert heart eye emoji here) |
We knew we would be happy with the results once all the hard work was done, but honestly I now think we would really have regretted
not changing out the flooring. The old tile, while being "okay," really wouldn't have fit with the rest of the renovation. So, once the tile was done, I came in for the wall prep and paint. Being a small room I was able to knock that out pretty quickly. I choose a slightly off-white color called Dove White, as I wanted to keep the space light and bright, and I knew the tile we had picked out would add enough color to the room. Once the walls were painted, Erik took back over with the project - installing the upper cabinets and glass tile backsplash. Actually I think before we got there the machines had to be moved back in, we were at that point well past a week without doing laundry and things were really starting to pile up! After the tile was done, the base cabinet, counter top, sink, and faucet were installed and the plumbing was hooked up. I came back in for the finishing touches - a new ceiling light, switch plate covers (we had to move some electrical and I had Erik add in an extra outlet near the pull-down ironing board) and organizing all those laundry supplies into the new cabinets. I can't say I miss that old, peeling shelf that was there when we moved in:

 |
| I don't even know what that grossness is! |
 |
| much better! |
We also found a really cool sink specifically made for laundry rooms that has a built-in washboard:
Lastly, we gave the door a makeover. I found a similar door on Pinterest and couldn't get it out of my head how cute it would look on our new laundry room. So, like the good husband that he is, Erik took over this project and did his best to recreate my Pinterest find. I think he did an amazing job!

Using the existing door, he cut out the top four panels. He then installed thin wood fillers to make something of a "box" inside the door, since it is a hollow-core type door. We had existing plexiglass leftover from the kitchen project, which he cut to fit the hole. Up until this point the project was free as we were able to reuse materials we already had on hand! On the back of the door, he used a roll-on style window frosting we found at Lowe's and then installed the glass. A thin piece of trim was added to both sides to hold the glass in place, and then he gave the whole door a fresh coat of paint. After it was installed and the hardware replaced, we were able to add the last (and my favorite) part - the decal sign. I found it on Etsy and it ended up being just the right thing to finish off this project.
And because I can't post without including Arlo...
And one last thing. If you ever visited our old house and are thinking that the new laundry room looks
really familiar, it's because you have pretty much seen it before. We loved our last laundry area so much we literally copied everything we could about it. From the white cabinets to the dark counter top and tile floor, to the same exact paint color and very similar tile back splash, we tried to recreate that space again in this house. What can I say, when you find something you like so much why try and switch it up? Here is the laundry room we renovated at our last house:
And that's all, folks! Thanks for coming along on the laundry room tour. With baby #2 expected to arrive any day now, there are no other big projects on the horizon. But then again, that's been said before...
;)